Our Trex deck build, start to finish, in three parts
The deck is the biggest DIY project at our house. We filmed it in three parts, in build order. This is the whole job on one page.
Part 1: out with the old deck
The old wood deck had a tenant: a skunk had moved in underneath. So the tear-out came with a second job.
- Pull up the old boards and the framing.
- Cut the old wood small enough to haul away.
- Run 1/4-inch mesh around the deck so no animal can get under it again.
- Measure, order the materials, and take delivery.
Part 2: the framing
- Set adjustable Simpson ZMAX post bases with wedge anchors. A hammer drill made the drilling much easier.
- Lay weed-block fabric under the deck.
- Build the pressure-treated framing.
- Put deck tape on every beam and joist.
We started out hammering by hand, then switched to a framing nailer.
Part 3: the boards
- Finish the framing with hurricane ties.
- Tape the joists.
- Do the perimeter boards first: miter them, dry-fit them, and pre-drill.
- Put in the cleats and the hidden fasteners.
- Lay the rest of the boards.
Our take on the hidden fasteners: easy to install, nearly invisible, and no screw holes through the boards. A bit pricey, but worth it.
The compressor we bought for it
We bought a Makita MAC2400 for this build and compared it with our Porter-Cable C2002 pancake compressor. From about 50 feet away we measured about 60 dB for the Makita and about 65 dB for the Porter-Cable. Quieter is the reason we switched.
One setup mistake to avoid on the Makita: the oil goes in before the air filter.